Replace HVAC systems NHS

$712,000.00 - K-12 Education

Localities

Is this project critical? or

No votes cast yet

Description Provided in Submission

The HVAC systems at Nandua High School date to when the school opened in 1984. These systems are by today's standards inefficient and costly to operate. The system components to be replaced consist of 2 boilers, 10 air handling units and the original pneumatic controls with DDC or digital controls. Replacement of these systems will allow greater control over more efficient and cost effective equipment thus reducing operating costs and increasing comfort to students and teachers while at the same time reducing carbon emissions to the environment.

Wiki Description

[edit] General Description

[edit] Points in Favor

[edit] Points Against

Edit the Wiki Description (editing policy)

Share

Post a comment

blog comments powered by Disqus